Construction Operations Automation

Client anonymized · Residential construction

From onsite notes and delayed Excel estimates to same-visit quotes.

Jeytex built a mobile construction estimating and progress-invoicing system that turns project measurements, quantities, and job-specific scope into structured material and labor pricing, customer-ready estimates, and staged invoices.

A field-first workflow built around how the contractor actually estimates and bills work.
60finalized estimates
56represented client records
37invoices generated
11 monthsof estimate records

Production records span December 2025 through October 2026, with estimates recorded in each month; this describes record history, not system uptime.

The Operational Problem

Estimating work continued long after the site visit

Project details were first captured onsite, then rebuilt later into calculations, a quote, and eventually invoice work.

01

Onsite information capture

Project scope and measurements were noted during the customer visit for later follow-up.

02

Excel reconstruction

The estimate and calculations were rebuilt later by hand, with hours of follow-up work reported by the client.

03

Repeated invoice work

Portions of the estimating work had to be done again when preparing invoices.

The prior workflow and time impact are based on client-reported experience.

The Transformation

From delayed reconstruction to a connected estimating workflow

Before

Onsite notes → Excel rebuild → manual calculations

→
After

Structured inputs → automatic pricing → material + labor totals

01
Before

Estimate prepared later, sometimes days afterward

→
After

Branded, customer-ready estimate generated from project inputs

02
Before

Estimating work repeated during invoicing

→
After

Progress invoices generated from estimate categories and scope

03

What Jeytex Built

A construction-specific estimating rules engine

An AppSheet and Google Workspace workflow connects field inputs, configurable pricing, document generation, and progress billing.

01

Structured field inputs

Capture project scope, measurements, and trade-specific details in a mobile workflow.

02

Configurable pricing

Apply catalog and estimate-specific pricing with separate material and labor calculations.

03

Customer-ready documents

Generate branded estimates and invoices from structured project data.

04

Progress invoicing

Build staged invoices from estimate categories as work progresses.

05

Direct delivery workflow

Send estimates and invoices to the customer with a copy to the contractor.

Visual Proof

One workflow from the jobsite to billing

Project details entered in the field flow through automatic pricing into a customer-ready estimate and, later, staged invoices.

Construction estimating workflow showing project inputs flowing into a generated customer estimate and progress invoicing.
Illustrative reconstruction based on the production system. Customer information and pricing shown are synthetic.

Measured in Production

A working system with a growing record of use

Audited production records show estimates, invoices, and pricing data across the observed period.

66stored estimates60 finalized · 6 draft
56represented client records
37invoice records131 invoice lines
78pricing itemsAcross 13 categories

Estimate-specific pricing snapshots were recorded for all 66 current estimates. These are audited system records, not claims of revenue, ROI, or error reduction.

Client-Reported Experience

A faster quote could happen during the visit

The contractor reported that the previous Excel-based process could take hours, with estimates sometimes delivered days later or around the following week. The contractor described at least two early occasions when an estimate was completed and sent while still with a prospective customer, and reported that the immediate quote helped win those jobs.

Qualitative account

The contractor also reported that the system saves hours of manual estimating work. These experiences are not independently measured ROI, exact hours-saved figures, or close-rate statistics.

System Flow

From project scope to staged billing

  1. 01Project scope + measurements
  2. 02Estimate-specific pricing
  3. 03Trade calculation rules
  4. 04Material + labor totals
  5. 05Branded estimate
  6. 06Progress invoicing

Google AppSheet · Google Sheets · Google Docs templates · AppSheet automation

Technical view

The 177-column estimate model includes roughly 60 derived, virtual, or system fields. Pricing logic uses conditional rules, lookups, aggregation, measurement calculations, and category rollups. The system models material and labor separately and stores estimate-specific pricing snapshots: 6,318 rows across all 66 current estimates.

Pricing Logic

The math happens behind the interface

Measurements and scope selections are translated through configurable pricing rules into separate material and labor calculations.

Construction estimating rules engine showing structured project inputs, configurable pricing logic, and calculated material and labor totals.
Illustrative reconstruction of the verified estimating logic using synthetic inputs and pricing.

Progress Invoicing

Estimate scope carried into staged billing

Invoice records show category-level lines tied back to estimate scope.

37invoices

131invoice lines

16estimates reached invoicing

Up to 5invoices associated with one estimate

Observed invoice line percentages include 30%, 70%, and 100%; these examples do not mean every project used the same schedule.

Scope & Completion

Built around the estimating and billing workflow

The system supports structured scope capture, configured pricing, generated documents, and staged invoicing. Illustrative public-proof visuals show the workflow and pricing logic using synthetic inputs.

  • Estimate and invoice documents are generated from structured project data.
  • Estimates and invoices are sent directly to customers with a copy to the contractor.
  • Some system tables and capabilities, including production photos and signatures, were not populated in the audited records.